We have methodology, tools and technical team for the execution of Datacenter Moving projects in all its stages.
One of OTG’s main differentials for this type of Project is high technical capacity that assures our customers that any problem that may occur after the reinstallation of the equipment at the destination location will be solved and operations will be restored in the shortest possible time.
We have already run Moving of more than 10,000 equipment, between servers and storage. All our Moving services are covered by full insurance for the products transported.
Preparation of the entire project, creation of schedule and initial documentation, assessment and necessary mappings, carried out together with the customer’s technical team.
Effective start of the process, where possible pre-failures in the equipment, shutdown monitoring, identification and labeling, photographic record, etc. are verified.
Step where the disassembly, packaging, accommodation and transport of equipment takes place, following strict safety rules and best practices.
Receipt, conference, assembly and startup of the equipment at the destination site, monitoring and validating the entry of each equipment into production.